I'm making good progress and have knit about 8 1/2 inches from the ruffle up. The pattern actually says to only knit 7 inches of the ribbed stitch but from what I've read on other ravelry member's pages who have knit this before is that it runs a little on the small side and I want to make sure it fits.
I'm already knitting the largest size possible so I don't think making it a little bit longer will hurt :) I stretched out the stitches around her waist and it looks like once I block it when I'm done it will just fit perfectly. Definitely no time to dilly dally on this one or she'll outgrow it before I finish *grin*.
A few more inches and then the pattern changes to divide for the sleeves and shaping the neck and I've read ahead on the pattern and it looks a little greek to me! Cross your fingers that I'll be able to continue knitting along smoothly without to much difficulty :)
On the book front I have to admit I really haven't done much reading at all. We've read a few more chapters in the Little House in the Big Woods but there hasn't been much reading time for mama. I've been so slow with my reading that I actually had to return my copy of the Happiness Project back to the library as it was requested by someone else and I couldn't renew it :( It will be a couple of weeks now before I can get it back. Hopefully when it's my turn again I'll be a little speedier!
Happy knitting :)
Hugs,
Rosina